Repair and Mitsubishi Outlander service since 2003 of release.
1. Operation and car maintenance
2. Engine
2.1. The general procedures of check and prevention without removal of the power unit
2.2. Removal and engine installation assembled
2.3. System of cooling of the engine
2.3.1. Check of a leakage of system of cooling
2.3.2. Check of pressure of opening of the valve of a stopper of a radiator
2.3.3. Replacement of cooling liquid
2.3.4. Check of the electronic block of the electrofan
2.3.5. Check of the relay of the electrofan
2.3.6. Removal and thermostat installation
2.3.7. Removal and installation of the pump of cooling liquid
2.3.8. Removal and installation of a water hose and water pipe
2.3.9. Removal and installation of a radiator of system of cooling
2.4. Greasing system
2.5. System of the distributed injection of fuel (MPI) of engines of a series 4G6
3. Transmission
4. Running gear
5. Steering mechanism
6. Brake system
7. Onboard electric equipment
8. Body
9. Appendix
10. Electric equipment schemes
 







2-3-7-snyatie-i-ustanovka-nasosa-okhlazhdayushhejj-zhidkosti.html

2.3.7. Removal and installation of the pump of cooling liquid

The operations which are carried out before removal and after installation of the pump
Merge and fill in cooling liquid.
Remove (establish) the GRM gear belt and the counterbalancing mechanism.

Sequence of removal
Remove a tension bracket of the generator.
Remove the pump of cooling liquid.
Remove laying of the pump of cooling liquid.
Remove a rubber sealing ring of a water pipe.

Installation of a rubber sealing ring of a water pipe
Removal and installation of the pump of cooling liquid
Establish a rubber sealing ring in a pro-point on a water pipe.
Moisten a rubber sealing ring and an internal part of the pump of cooling liquid with water.
After that insert a water pipe into boring on the pump of cooling liquid.


2.3.6. Removal and thermostat installation

2.3.8. Removal and installation of a water hose and water pipe