4-5-2-snyatie-i-ustanovka-rychagov-podveski.html
4.5.2. Removal and installation of levers of a suspension bracketRemoval of the managing director of a bar / bottom lever of a suspension bracket assembled
Having put an adjusting label on an adjusting bolt of a convergence or disorder, disconnect an operating bar or the bottom lever assembled.
Detachment of the top lever in collecting / the bottom lever in collecting and the longitudinal lever
Having propped up the bottom lever a jack, disconnect the top lever in collecting / the bottom lever in collecting and the longitudinal lever of a suspension bracket.
Connection of a rack of the stabilizer
Tighten самоконтрящуюся a nut so that the length of an acting carving part of a rack of the stabilizer of cross-section stability left on nominal size.
Nominal rate And: 6–8 mm
|