8-2-22-snyatie-i-ustanovka-lyuka-kryshi.html
8.2.22. Removal and installation of the hatch of a roof
Removal
Remove ceiling facing.
Remove forward lateral facing.
Removal of details is made in an order specified in drawing.
Installation
Installation of details is carried out as it should be, the return to removal.
At installation of details pay attention to installation of a drainage hose.
Establish the rubber plug and provide a vystupaniye of a drainage hose on the size specified in drawing.
After completion of installation of details execute adjustment of the hatch and check tightness of the hatch.
Execute initialization of the electronic control unit by the hatch.
Establish forward lateral facing.
Establish ceiling facing.
Check of the switch of the electric drive of the hatch
Check a chain condition between socket conclusions at various positions of the switch.
Check that the chain is closed only between conclusions «4» – «5», when the switch in the situation "OPEN" (resistance less than 2 Ohm).
Check that the chain is opened by conclusions «3» – «4», «3» – «5», «3» – «6», «4» – «5», «4» – «6» and «5» – «6», when the switch in the situation "OFF".
Check that the chain is closed only between conclusions «3» – «4», when the switch in the situation "UP" (resistance less than 2 Ohm).
Check that the chain is closed only between conclusions «4» – «6», when the switch in the situation "CLOSE/DOWN" (resistance less than 2 Ohm).
|